Skip to content

Psychosocial risk register builder

Build the psychosocial risk register an inspector expects: list each hazard, rate it, record controls in hierarchy order, consultation, a responsible person and a review date, then download it as Word or CSV, or print it.

Figures checked 10 November 2026. Free to use, no sign-in.

See the document

Not sure where to start? Run the psychosocial risk self-assessment first, then record what you find here. For physical hazards, use the risk assessment matrix.

Register details

Choose yours so the register cites your own laws. Victoria has separate psychological health regulations.

Rating method

Consultation

Hazard 1

Complaints, overtime or leave data, survey results, incidents.

Rating: High (score 12)

reg 55D(2)(b): how hazards interact or combine.

Hazard 2

Complaints, overtime or leave data, survey results, incidents.

Rating: High (score 9)

reg 55D(2)(b): how hazards interact or combine.

Add a hazard

Psychosocial risk register

Hazards
2
High or critical
2
Method
Duration, frequency, severity

Check before you use it

  • “Heavy workload or constant time pressure” needs a responsible person and a review date.
  • “Aggression or violence from customers, clients, patients or others” needs a responsible person and a review date.
  • Record who you consulted. You must consult affected workers when identifying hazards, assessing risks and deciding controls (ss 47 and 49 of the Act).
  • Consider how the hazards in the register combine (for example high workload with low support), as reg 55D(2)(b) requires.
  • Keep worker names and personal details out of the register where you can: describe groups and roles, and keep individual complaints in confidential files.
  • Replace every [bracketed] item and delete rows that don’t apply.

Psychosocial risk register

Business (PCBU)[Business name]
Workplace, team or work covered[What this register covers]
Prepared by[Name and position]
Date prepared[Date]
Next full review[Review date]
JurisdictionNot chosen (model WHS laws)
Rating methodSeverity × (duration + frequency), reg 55D(2)(a)

Laid out against regs 55A–55D of the model WHS Regulations, which the states and territories other than Victoria have adopted in their own regulations: identify psychosocial hazards, eliminate the risks so far as is reasonably practicable or otherwise minimise them, having regard to the matters in reg 55D(2), and keep the controls under review (reg 38). The register follows the hierarchy of control measures because good practice and the code of practice recommend it. Some states and territories make it mandatory for psychosocial risks: choose yours to see the rule that applies. Consultation follows ss 47–49 of the model WHS Act. Victoria has separate Occupational Health and Safety (Psychological Health) Regulations 2025 (from 1 December 2025). Choose your state or territory to cite your own laws. This is a draft prepared from the details entered. It does not by itself show that your obligations are met: check it with the people doing the work, and update it when things change.

Consultation

Workers consulted[Who was consulted]
How[Meetings, survey, one-to-one discussions]
When[Date]
Health and safety representativeNo health and safety representative for these workers
What workers said, and how it was taken into account[Summary of views and what changed]
How workers were told the outcome[How and when]

Summary

Hazards in this register2
Critical (13–18)0
High (9–12)2
Moderate (5–8)0
Low (2–4)0

Register (highest risk first)

1. Heavy workload or constant time pressure

Source (reg 55A)Design or management of work
Who could be harmedCustomer service team
Where it shows upRegular unpaid overtime; two staff raised workload at the last team meeting
Combines withNot enough support from managers
RatingHigh: Severity 2 Moderate × (duration 3 Long + frequency 3 Often) = 12
ActionPut further controls in place promptly, with a set completion date.
Existing controlsNone recorded
1. Eliminate[How the hazard could be removed, or why that isn’t reasonably practicable]
2. Change the workSet realistic daily targets with the team; Cover peak periods with an extra rostered person
3. Administrative controlsWeekly check-in on workload
Responsible person[Who]
Review by[Review date]

2. Aggression or violence from customers, clients, patients or others

Source (reg 55A)Workplace interactions or behaviours
Who could be harmedFront counter staff
Where it shows upThree incident reports in the last quarter
Combines withNone recorded
RatingHigh: Severity 3 High × (duration 1 Short + frequency 2 Sometimes) = 9
ActionPut further controls in place promptly, with a set completion date.
Existing controlsNone recorded
1. Eliminate[How the hazard could be removed, or why that isn’t reasonably practicable]
2. Change the workCounter redesign with a safe retreat area; Duress alarm at the counter
3. Administrative controlsDe-escalation training; Post-incident support and debrief
Responsible person[Who]
Review by[Review date]

How controls are chosen

  1. Eliminate the risk so far as is reasonably practicable, whatever its rating (reg 35).
  2. If that isn’t reasonably practicable, minimise it. Good practice and the code of practice recommend starting with higher-order controls. For psychosocial hazards this usually means changing the work itself: workload, staffing, deadlines, rosters, job design, how work is organised and supported, or the physical workplace.
  3. Then administrative controls for any remaining risk, such as procedures, information, training and supervision. Relying on them alone isn’t recommended where a higher-order control is reasonably practicable.
  4. In choosing controls, have regard to all relevant matters, including how long, how often and how severely people are exposed, and how hazards interact or combine (reg 55D(2)).
  5. Keep controls working (reg 37).

Rating scales

Duration

1 Shortminutes or hours at a time
2 Mediumdays or weeks at a time
3 Longongoing, or months at a time

Frequency

1 Rarelyless than monthly
2 Sometimesweekly to monthly
3 Oftendaily or most shifts

Severity

1 Lowstress or discomfort that passes
2 Moderateharm needing support or time off
3 Highserious psychological or physical injury

The rating sets priority only. It is a planning aid, not a legal test of what is reasonably practicable.

Review

Review each row by its date and the whole register by [review date]. Also review and, if needed, revise a control when it isn’t controlling the risk, before a change likely to create a new or different risk, when a new hazard or risk is found, when consultation shows a review is needed, or when a health and safety representative asks (reg 38(2)). Consult workers again when you do (s 49 of the Act).

Sign-off

Prepared byName ____________ Signature ____________ Date ________
Approved byName ____________ Signature ____________ Date ________

Draft prepared with a free tool. Tailor it before use. General information, not legal advice.

Highlighted text in [brackets] still needs your input. The rating sets priority; it doesn’t decide what is reasonably practicable. Nothing you type is sent anywhere; it is kept only in this browser. General information, not legal advice.

Take this further

Ask a safety question

The Workfloor advisor answers work health and safety questions with the section of the WHS Act or Regulations it relied on.

Try it free

By creating an account you agree to our Terms and Privacy policy.

Next step

Ask the Workfloor HR advisor

A tool gives you a figure or a draft; the advisor answers the question that comes next, with the section of the law or the award clause behind each answer. Your question is ready: change it to fit your business before you send it.

Starts with this question

How do I consult workers and review the controls for the psychosocial hazards in my register, and what does a regulator expect me to show?

Ask the advisor

Free to try: 2 questions, no card. Nothing is sent until you press Ask.

By creating an account you agree to our Terms and Privacy policy.

How this works

Choose your state, territory or the Comcare scheme and every citation in the register uses your own laws; leave it unchosen for general model-law wording. Hazards are grouped by the four sources in reg 55A of the WHS Regulations. Each row is rated by either severity × (duration + frequency), giving 2 to 18 (Low 2–4, Moderate 5–8, High 9–12, Critical 13–18), or likelihood × consequence, giving 1 to 25 (Low 1–4, Moderate 5–9, High 10–14, Critical 15–25, with a major consequence at least Moderate and a catastrophic one at least High). The register lists the highest risks first.

Controls are recorded in hierarchy order: eliminate, then change the work, then administrative controls. Where your regulations apply reg 36 to psychosocial risks (Comcare, NSW, Queensland and South Australia), the register says so; elsewhere it presents the order as the good practice the code of practice recommends. The register flags a high risk with no further controls, and any row that relies only on training or procedures.

Consultation is recorded against ss 47–49 of your WHS Act, and review triggers follow reg 38. Western Australia’s WHS (General) Regulations 2022 follow the model (regs 55A–55D). Victoria is different: the register cites s 20 and s 35 of the OHS Act 2004 and the OHS (Psychological Health) Regulations 2025. In Queensland, a harassment risk also triggers the written prevention plan check (s 55H).

For guidance on hazards and controls, see Safe Work Australia’s model Code of Practice: Managing psychosocial hazards at work. Nothing you type leaves your browser.

Questions

Do I have to keep a psychosocial risk register?

The WHS Regulations don’t require a document called a register. They do require you to identify psychosocial hazards, eliminate or minimise the risks, and keep your controls under review, and you must consult workers along the way. A register is a practical way to show an inspector, and your team, that you have done that and what happens next. In Queensland, if you identify a risk of sexual harassment or sex or gender-based harassment, you must also prepare, implement and review a written prevention plan (s 55H of the Work Health and Safety Regulation 2011 (Qld), from 1 March 2025).

What counts as a psychosocial hazard?

Under reg 55A, a hazard that arises from the design or management of work, the work environment, plant at the workplace, or workplace interactions or behaviours, and may cause psychological harm. Common examples are heavy workload, low support, poorly managed change, bullying, harassment and aggression from customers.

Which rating method should I use?

Either works. Duration, frequency and severity follows the first matter listed in reg 55D(2): how long, how often and how severely people are exposed. Likelihood × consequence matches a standard 5 × 5 risk matrix. Neither score is a legal test; it only sets the order you deal with risks in.

Is training enough to control a psychosocial risk?

Usually not on its own. In the Commonwealth (Comcare) scheme, New South Wales, Queensland and South Australia, the regulations apply the hierarchy of control measures (reg 36) to psychosocial risks: if you can’t eliminate the risk, minimise it with higher-order controls first, such as changing workload, staffing, rosters or how work is organised, and use training and procedures for the risk that remains. Elsewhere, good practice and the code of practice recommend the same order. In Victoria, information, instruction or training can be the only control only where nothing else is reasonably practicable, and must not be the main control.

Does this apply in Victoria or Western Australia?

Yes, with your own laws. Western Australia follows the model WHS laws: its Work Health and Safety (General) Regulations 2022 have psychosocial rules in regs 55A–55D, although WA does not apply the reg 36 hierarchy to psychosocial risks. Victoria has separate Occupational Health and Safety (Psychological Health) Regulations 2025, in force from 1 December 2025; choose Victoria and the register cites the OHS Act 2004 and those regulations instead.